PROJECT BRIEFdetail

THE PROJECT FOR ENHANCING COAST GUARD CAPABILITIES IN THE REPUBLIC OF PALAU
(BERTH & ADMINISTRATION BUILDING)

<OUTLINE OF THE PROJECT>
 The Nippon Foundation has been supporting three Micronesian countries, i.e. Palau, Federated States of Micronesia and Marshall Islands for enhancing their coast guard capabilities since 2008. The project is implemented in collaboration with The Sasakawa Peace Foundation, The Japan Association of Marine Safety (JAMS) and the governments of Australia and U.S.A. Under the project in Palau, a patrol vessel of 40m, berthing facilities and an administrative building for “Bureau of Maritime Security and Fish, Wildlife Protection” were constructed
Fisheries Engineering Co., Ltd. rendered full consultant services for design and supervision of all these constructions.
By the President of Palau, Mr. Tommy E. Remengesau Jr. , the berth was named “Melusch Melachel” (meaning “Port of Fortune” in Palauan language) and the administration building “Bai ra Bul” (meaning “Watch Tower” in Palauan language)

PROJECT PHOTOGRAPHS

palau_pic1palau_pic2

         Bird's-eye view Photo                Overall view for Main Berth

palau_pic3 palau_pic4

            Main Berth                   New Administration Building

palau_pic5palau_pic6

            Entrance Hall                      Operation Room

palau_pic7 palau_pic8

          Conference Hall                    Dining Room

palau_pic9palau_pic10

            Gymnasium                 A state of Completion Ceremony


DATA

The Client The Japan Association of Marine Safety (JAMS)
Location DMLE Site, KOROR, REPUBLIC OF PALAU
Construction Term Nov. 2016 to Dec. 2017
The Consultant Fisheries Engineering Co., Ltd.
The Contractor IWATA CHIZAKI INC.
Facilities
<Civil Works>
1. Main Berth for Patrol Vessels
- L45.0 m x W7.0 m + Access Part L35 m
- Foundation: Steel pipe pile type
- Upper structure: RC
2. Stepped Quay
- L7.0 m x W2.5 m
3. Small Boat Ramp
- L25.0 m x W6.0 m with Steps
Other External Work 1 L.S.
Facilities
<Architectural Works>
1. New Administration Building
- 1,031 m2
- Steel Structure, ALC External Wall
2. Rehabilitation of Existing Building
- 445 m2
- RC, CB External Wall
3. EQUIPMENT, etc
-Solar Power System Power-generating Capacity 19 kW
-Business Equipment & Furniture 1 L.S.
-Security Camera System 1 L.S.
-Business Telephone & LAN System 1 L.S.
-Air Conditioning System 1 L.S.