PROJECT BRIEFdetail

PROJECT FOR IMPROVEMENT OF FUNAFUTI PORT IN TUVALU

<OUTLINE OF THE PROJECT>
 This project is intended to eliminate the difficulty in maintaining the port functions of the existing Jetty due to aging and the shortage of cargo-handling equipment as well as various other current problems through construction of Funafuti Port Facility, as part of the overall effort to establish Tuvalu as a stable nation.

PROJECT PHOTOGRAPHS

内装1外観

      Overall view from FUNAFUTI Port                 Warehouse

内装2 内装3

         Overall view from Land                   Warehouse

内装2内装3

     Cargo vessel that docked at the New jetty      The New jetty was named "NIPPON WHARF"


DATA

The Client Department of Fisheries, Department of Marine, Tuvalu
Location Funafuti Port, Funafuti Island, TUVALU
Construction Term January 2008 to March 2009
The Consultant Fisheries Engineering Co., Ltd.
The Contractor DAI NIPPON CONSTRUCTION
Facilities
<Civil Works>
1. L-shaped jetty
- Length: L80.0 m x W16.0 m + L50.0 m x W12.0 m
- Foundation: Steel pipe pile type
- Upper structure: RC.
2. Access bridge
- L51.5 m x W8.0 m
3. Quay for fishing boats
- Length: 12.0 m with steps
4. Seawall
- Length: 103 m (H=1.45 m)
5. Container yard (600 sq. m.)
6. Other Facilities
- Mooring dolphins, Navigation aids
Facilities
<Architectural Works>
1. Repair of the warehouse (Floor area: 875 sq. m.)
2. Water Tank (Capacity: 600 cu. m.)
Equipment 1. Forklift
2. Trailer
3. Tractor